Reconstruction of reformer refractory lining on OEMK (part of Metalloinvest)was finished.
The project was prepared by our company on base of upto-date materials and constructions.
The roof construction was designed together with our partners Thermal Ceramics.
A working layer was done with the material of our own production NK-30 .
The roof was done with the materials of Thermal Ceramics.
This construction leads to lower the heat loss and to increase the capasity.