In september 2014 within 28 days our copmany constructed 130 heigh stuck including refractory isolation.
Method of slipform was used.
The main stack and refractory isolation were performed simultaneously based on patented method of our company.
http://www.youtube.com/watch?feature=player_embedded&v=eBNKtlQ7XZM