• About us
  • Services
  • Products
  • Solutions
  • Works
  • Partners
  • Feedback
  • Contacts
ruen
txm
✕

29.08.2013 Building of stack on MGOK (part Metalloinvest)

  • 29.12.2014 Participation in Exhibition "Cement. Concrete. Dry mixes"
  • 07.10.2014 Construction of the 130 m stack on Lebedinsky GOK
  • Start up of anchor fabrication line
  • 07.10.2014 Construction of 130 meter high discharge stack on Lebedinsky GOK (Metalloinvest)
  • 29.08.2013 Building of stack on MGOK (part Metalloinvest)
  • 29.08.2013 Building of silos (slip Form method)
  • 01.10.2014 Start up of dry refractory mixes line
  • News archive
  • 01.02.2015 Participation in the exhibition "Domestic building materials 2015"
  • 12.02.2015 Participation in the conference "Refractories for industry"
  • 16-20 June, 2015 Participation in THERMPROCESS 2015. Germany, Dusseldorf
  • 2015. Yuzhno-Kyrgyzskij Cement CJSC (Kyrgyz Republic) - Cement plant thorough overhaul

 

In August the stack of 130m heigh was built on pelletizing plant of MGOK (part Metalloinvest) 

During the construction we used our patented method. Refractory lining is constructed together with the concrete shell of the stack. This method allows us to fulfill the construction within 30 days.

© 2011, NK-Teplohimmontazh. All rights reserved.
Google+