In 2011, the reconstruction of the Rolling Mill-1 continuous kiln and supply of materials were performed at JSC Ural Steel (Novotroitsk, Orenburg region).
The old lining was completely replaced with a new modern multilayered one.
The total volume of materials supplied was approximately 800 tons.